This Practice Note provides guidance to inform practitioners about the requirements for rainwater supply to water closet cisterns.
The content below provides guidance on:
This Practice Note (formerly Technical Solution Sheet) is currently under review.
This Practice Note (formerly Technical Solution Sheet) is currently under review.
This Practice Note (formerly Technical Solution Sheet) is currently under review.
This Practice Note (formerly Technical Solution Sheet) is currently under review.
This Practice Note provides guidance on the regulatory framework for plumbing work captured under the National Construction Code (NCC) 2022 Volume Three – Plumbing Code of Australia.
Superseded documents
These are Superseded Practice notes relating to RF 01 Regulatory Framework Plumbing:
This Practice Note specifies the regulatory framework for Standard Gas Installations
The content below provides guidance on:
Superseded Document
These are Superseded Practice notes relating to RF 02 | Gasfitting – Type A appliances and Standard Gas Installations
This Practice Note provides guidance on regulatory framework requirements for roof (stormwater) plumbing; and;
Superseded Document
These are Superseded Practice notes relating to RP 01 | Regulatory Framework
This Practice Note provides guidance on the Deemed-to-Satisfy (DtS) requirements for the installation of box gutters with sole widths between 200mm and 600mm, and;
Superseded documents
These are Superseded Practice notes relating to RP 02 Box Gutters:
This Practice Note provides guidance on requirements for the installation of eaves gutters; and:
Superseded documents
These are Superseded Practice notes relating to RP 03 | Eave Gutters:
This Practice Note provides guidance on the requirements for installation of downpipes; and:
Superseded Document
These are Superseded Practice notes relating to RP 04 | Downpipes
This Practice Note provides guidance on the requirements for the installation of flashings; and:
Superseded Document
These are Superseded Practice notes relating to RP 05 | Roof flashings
This Practice Note provides guidance on roof sizing and calculations for a complete roof drainage system; and:
Superseded Document
These are Superseded Practice notes relating to RP 06 | Sizing a roof catchment drainage system
This Practice Note provides guidance on the requirements for the provision of floor waste gullies in urinal compartments and other wet areas, and;
Superseded Document
These are Superseded Practice notes relating to SP 01 | Floor waste gullies in urinal compartments and other wet areas
This Practice Note (formerly Technical Solution Sheet) is currently under review.
This Practice Note provides guidance on applying the solar water heater option to meet Victorian energy efficiency variation to the National Construction Code 2019 Volume Two and associated requirements in the Plumbing Regulations 2018. It replaces Plumbing Practice Note SH-01: Solar Water Heaters version 3 dated 1 May 2023 to provide updated information on amendments to the Plumbing Regulations 2018 which came into effect on 28 November 2023.
The content below provides guidance on:
Superseded documents
These are Superseded Practice notes relating to SH 01 Solar Water Heaters: